Case Study - Ashbourne Airfield
- holly9751
- 2 days ago
- 1 min read
1. Client / IndustryFriel Construction / Civil Engineering & InfrastructureLocation: Ashbourne Airfield
2. ProblemFriel Construction required a reliable paving solution to lay an 80mm base course at Ashbourne Airfield. The project needed a high-output paver capable of maintaining consistent mat quality and width, while operating efficiently within an active airfield environment and tight programme.
3. Solution (AP Pavers approach)AP Pavers supplied a Vögele 1803-3i paver on hire, complete with a skilled operator. The machine was fitted with a 250mm extension to achieve the required paving width and deliver consistent results across the base course.
4. Process
Machine and operator supplied to site as part of a short-term hire
Vögele 1803-3i set up with 250mm extension
Base course laid to an 80mm depth
Continuous paving achieved with smooth material flow and consistent levels
Operator worked alongside Friel Construction’s site team to meet programme requirements
5. Result
The base course was laid efficiently and to specification, with a high-quality finish and consistent thickness throughout. The hire solution supported Friel Construction in maintaining productivity on site while meeting programme and performance expectations at Ashbourne Airfield.